  • And this one of the reason that MoP, coal ministry and MNRE have been merged under an able minister Piyush Goyal
  • edited February 2015
    ^^^
    MNRE has been a quite 'weak' ministry since its inception. The policy inputs suggested by it were excellent and were praised by the erstwhile PC which did attract several investors with huge capital (suzlon too). But mindless activism shown by MoEF and regulators' non-accountability were biggest roadblocks. The unavailability of wind plant equipments' indegenious manufactureres was also an issue which is expected to be countered by MII.
    yes , agreed. Had got a chance to meet its Jt. Secretary, 1-2 times.
    And this one of the reason that MoP, coal ministry and MNRE have been merged under an able minister Piyush Goyal
    any other advantages of this step?
  • Btw, something more to munch on -

    As part of the amendment to the Electricity Act, 2003, the Ministry of Power aims at segregating carriage and content in power distribution. Under the separate carriage and content model, one company would own the network while electricity supply would be done by different entities. At present, power discoms supply as well as manage network that provides electricity for residential and commercial purposes.

    Thoughts/Comments?
  • Question - What is the difference between T&D losses and AT&C losses?
  • edited February 2015
    Question - What is the difference between T&D losses and AT&C losses ?
    1) T&D loss is transmission and distribution loss while AT&C loss is Aggregate Technical and Commercial losses
    2) T&D losses are technical in nature and concerns with transmission and distribution of power and they are inherent losses in the system. while AT&C losses combines all external as well as inherent losses of the system. T&D losses mainly confined to areas such as inefficient conductors, corona, reactive power,load management/balancing etc.. while AT&C losses includes T&D losses as well as external factors, like theft, defective billing/metering.
    3) currently T&D losses are at 23% ,while AT&C is slightly higher (~ 27%)
  • ^^^
    MNRE has been a quite 'weak' ministry since its inception. The policy inputs suggested by it were excellent and were praised by the erstwhile PC which did attract several investors with huge capital (suzlon too). But mindless activism shown by MoEF and regulators' non-accountability were biggest roadblocks. The unavailability of wind plant equipments' indegenious manufactureres was also an issue which is expected to be countered by MII.
    yes , agreed. Had got a chance to meet its Jt. Secretary, 1-2 times.
    And this one of the reason that MoP, coal ministry and MNRE have been merged under an able minister Piyush Goyal
    any other advantages of this step?
    1. In line with min govt max governance
    2. Power 'infrastructure' sector is consolidated
    3. Currently Power sector regulators submit their annual reports/other accounts to the govt but a draft regulatory reform bill plans to extend autonomous power to infrastructure regulators of the nation. Infrastructure regulators such as TRAI and CERC will have to now be answerable to Parliament. The regulators of electricity, post, airports, highways will now have to submit annual reports to Parliament and be legally accountable. In order to avoid multipliplicity in fixation of resposibility on diff ministries an integrated MoP is desirable.
    http://www.thehindu.com/news/national/heads-of-regulators-should-be-made-accountable-to-parliament/article5157480.ece
    4. Coal linkages are provided to many industries under supervision and control of various ministries. BUT the power sector was facing maximum crunch and was a critical sector 4 development hence coal+power together
    5. MoS (IC) profile is deliberately given to both MoP and MoEF so that any deadlock (not possible under Modi ;P) can be resolved in cabinet meetings easily.

    Any other inputs from u ppl
  • ^^ A request, please highlight the keywords in your posts. Everything is going over the head for me. :( Thanks for sharing so many articles!
  • Question - What is the difference between T&D losses and AT&C losses ?
    1) T&D loss is transmission and distribution loss while AT&C loss is Aggregate Technical and Commercial losses
    2) T&D losses are technical in nature and concerns with transmission and distribution of power and they are inherent losses in the system. while AT&C losses combines all external as well as inherent losses of the system. T&D losses mainly confined to areas such as inefficient conductors, corona, reactive power,load management/balancing etc.. while AT&C losses includes T&D losses as well as external factors, like theft, defective billing/metering.
    3) currently T&D losses are at 23% ,while AT&C is slightly higher (~ 27%)
    Good answer @aamengineer
    Follow up question -

    So do you mean to say that the loss associated with theft, billing/metering, non-recovery of payment is only ~4%? That sounds too low, doesn't it?
  • Question - What is the difference between T&D losses and AT&C losses ?
    1) T&D loss is transmission and distribution loss while AT&C loss is Aggregate Technical and Commercial losses
    2) T&D losses are technical in nature and concerns with transmission and distribution of power and they are inherent losses in the system. while AT&C losses combines all external as well as inherent losses of the system. T&D losses mainly confined to areas such as inefficient conductors, corona, reactive power,load management/balancing etc.. while AT&C losses includes T&D losses as well as external factors, like theft, defective billing/metering.
    3) currently T&D losses are at 23% ,while AT&C is slightly higher (~ 27%)
    Good answer @aamengineer
    Follow up question -

    So do you mean to say that the loss associated with theft, billing/metering, non-recovery of payment is only ~4%? That sounds too low, doesn't it?
    Yup is seems very low. Is it so??
  • ^^ A request, please highlight the keywords in your posts. Everything is going over the head for me. :( Thanks for sharing so many articles!
    Sorry for your inconvenience sir. Will try to put it more meaningfully and objectively. My bad